Predictive intelligence for AI infrastructure

Physical systems. Commercial consequences.

We predict what will delay or interrupt AI compute, so data centre operators and neoclouds get capacity live and keep it dependable.

Predictive models forecast what will slip, and AI agents investigate the consequence and coordinate the response before capacity is lost.

Explore what we're building ↓

01 / One site

Finding the one thing that is actually holding up go-live.

Power, electrical, cooling and compute all have to be ready before a customer can run anything, and each one is tracked by a different team in a different system. Veltora looks through all four and finds the item that is setting the date.

Veltora scanning 4 layers 1 blocker found · 14 days recoverable

02 / The problem

Installed capacity is not usable capacity.

Between the capacity on the plan and the capacity earning revenue sit several distinct states. Capacity leaks out at every one of them, and each leak is owned by a different team, tracked in a different system, and caused by something different.

Installed

Hardware on site and racked

Energised

Grid milestones, transformers, switchgear, electrical commissioning

Healthy

Cooling capability, node validation, burn-in, firmware, network and topology

Customer-ready

Acceptance testing, RMAs, spares, restrictions, approvals

Earning

Allocated to a paying commitment and running workloads

Illustrative. Colocation operators and neoclouds lose capacity at different stages, for different reasons.

01

Infrastructure blocker

Equipment, power, cooling or commissioning slips

02

Capacity cannot go live

Committed MW or GPUs are not customer-ready

03

Financial exposure

Delayed revenue, penalties, idle capital and customer risk

04

Veltora’s economic value

Find the interventions that recover customer-ready capacity sooner

$28–47M

A 16,384-GPU cluster, one month short of customer-ready

~$39M

A 40 MW energisation tranche, five months late

~$2.4M

A 12 MW hall handed to a tenant a month late

SemiAnalysis GPU contract rates and CBRE wholesale asking rates. Revenue alone, before penalties, idle capital and the customer who goes elsewhere.

03 / The platform

One model of your site, built from every system you already run.

Every system an operator runs sees one slice. The ERP knows the order. The schedule knows the plan. The utility knows the grid milestone. The BMS and DCIM know the facility. GPU telemetry knows the nodes. Sales knows the promise. Veltora reads all of it and answers the one question none of them can.

Reads from, replaces none of them

Project schedule ERP & procurement Supplier email & portals Utility & grid updates BMS / DCIM Commissioning tracker GPU telemetry Cluster manager & RMA CRM & contracts

What it does, continuously

01 / READ

Reads reality

Live signals from suppliers, equipment, facilities, the grid and GPUs, not just what someone typed into a plan. A supplier email becomes a structured fact with a source, a timestamp and a confidence.

02 / FORECAST

Forecasts usable capacity

Megawatts and GPUs available on each date, with probabilities, from models trained on what actually happened on real projects.

03 / CALCULATE

Calculates consequence

Which customers are exposed, how much capacity, how many days, how much revenue, and which few issues actually move the date. This arithmetic is deterministic and checkable.

04 / ACT

Drives the fix

Compares the interventions available, recommends the one that recovers the most, and has agents do the chasing. Anything consequential waits for a human.

The loop closes. Every outcome is recorded against the prediction that preceded it, which is what makes the next forecast better.

One dependency model underneath

A live, versioned graph of how everything depends on everything else: which transformer feeds which hall, which hall hosts which cluster, which cluster serves which customer commitment. When one fact changes, Veltora already knows what it touches.

Transformer TX-02128 wk lead · ETA moved twice
→
SwitchgearLV board B
→
Hall 34.1 MW design
→
Cluster A1,024 GPUs
→
CommitmentCMT-0142 · due 15 Nov
↑
↑
↑
Grid connectionTranche 2 · 40 MW
Cooling loopCHW-2 redundant
Node validationburn-in, firmware, RMA

Every edge carries its evidence, its source system, and the date it was last confirmed. Change one fact and Veltora already knows what it touches.

04 / Products

Built for the physical layer of AI.

Each product answers a different question about the same thing: how much capacity you can actually use, and when. They run on one model of your site, so what one product learns, the others already know.

GET IT LIVE / Supply Chain Intelligence

Spot the equipment that will arrive late, weeks before the date officially moves.

Veltora tracks supplier commitments and how their dates have moved across transformers, switchgear, chillers, PDUs and GPUs, and connects every item to the infrastructure waiting on it.

  • 01Delivery risk scoring on long-lead equipment
  • 02Supplier reliability: who slips, by how much, and how early they say so
  • 03Approved alternatives and reallocation options when an order will not make it
  • 04Every item linked to the halls, clusters and commitments downstream

A transformer order has quietly moved twice in six weeks. Veltora scores it as likely to move again and shows that Hall 3 and a 12 MW handover sit behind it, eleven weeks before anyone would have noticed.

Get AI compute online faster. Keep it dependable.

05 / A decision

One signal. Twenty-one days. Six days to act.

A supplier email arrives on 10 October and moves a transformer by three weeks. Nothing in the plan changes. Veltora reprices the customer date immediately, finds the two issues that control it, and puts a dated decision in front of the person who owns the commitment.

CMT-0142 / 1,024 GPUs / Hall 3

PROMISED

15 Nov

NOW FORECAST

6 Dec

21 days late

PROBABILITY OF 15 NOV: UNDER 2%

15 Nov promised 6 Dec forecast
2 of 18 Open issues that actually control the date. The other sixteen can slip without moving it.
14 days Recovered by borrowing the transformer already approved for Phase 2, worth $0.8M to $1.4M brought forward.
6 days Left to decide. After 16 October the lead time closes and the option is gone.

$0.8–1.4M

Brought forward by recovering 14 days on a single 1,024-GPU commitment

4–7×

What that one decision is worth against a year of Veltora at target pricing

Capacity × days

How we measure everything. Ten megawatts recovered by fourteen days is 140 MW-days brought forward, converted to dollars only where the contract supports it

06 / Technology

A prediction stack built for physical infrastructure.

Each technology is used only for what it is genuinely best at, and anything that has to be exactly right is calculated rather than generated.

01

Live signals

Veltora reads the systems you already run, and the evidence that never reaches a system, like the supplier email that quietly moves a date.

02

The infrastructure model

One live model of how your site actually hangs together, from equipment through to the customer commitment it serves. When something changes, Veltora already knows what it touches.

03

Prediction

Models trained on how infrastructure gets delivered in practice rather than on what the schedule said. They are calibrated, so a 30% risk happens about three times in ten.

04

The decision engine

Every date, megawatt and dollar is calculated, never generated. You can check any number Veltora puts in front of you.

05

Agents

Agents do the chasing: gathering evidence, reconciling what disagrees, preparing the options and following through once you approve. Anything that leaves your building waits for a person.

07 / Who we serve

Capacity committed to a customer, against a date.

That one condition defines our customer. If capacity is promised and real money is lost when it slips, Veltora has something to protect. Both of these buyers ask the same underlying question, which is why one platform serves both.

01

Data centre operators

Commercial owner-operators undertaking a funded expansion, fit-out or upgrade, with customer capacity committed against a delivery date.

Promises
Megawatts handed over to a tenant by a date
Leaks at
Equipment, grid power, electrical and cooling commissioning
Their question
How many megawatts can we hand over, and when?
Champion
Head of delivery or programme director
Also uses it
Procurement, commissioning, power and energy, commercial

02

Neoclouds

GPU clouds that directly build or manage physical GPU clusters and own customer readiness commitments.

Promises
GPUs customer-ready by a date
Leaks at
Node validation, burn-in, firmware, network, RMAs, and the facility underneath
Their question
How many GPUs can we sell, and when?
Champion
Head of infrastructure or fleet
Also uses it
Fleet engineering, procurement, commercial

80%

Utilisation below roughly this level flatlines neocloud returns, so every idle GPU-day comes straight out of the return

McKinsey

Every 3 hours

Unexpected interruption on a 16,384-GPU training cluster, around 78% of them hardware

Meta, Llama 3 infrastructure report

Delivered / Healthy / Reserved / Active

NVIDIA requires its cloud partners to track every GPU in these states. The industry already separates hardware existing from capacity being usable

NVIDIA cloud partner requirements

08 / Build with us

Bring us the problem worth solving.

We work with a small number of operators and neoclouds bringing capacity online right now. A paid pilot runs six to eight weeks on one capacity block and one customer date, credited against year one.

You bring a real commitment with a real date. We replay a completed project of yours event by event to show what Veltora would have said at the time, then run live alongside your own process so you can judge it against something.

sales@veltora.net

Veltora / Working with data centre operators and neoclouds worldwide